What does a generator install cost?
Generac puts most whole-home standby installs at about $8,000–$16,000, generator included. As an authorized Generac dealer, we sell you the generator and a licensed electrician installs it. Here is what moves a Waukesha County home up or down that range, and how to get a real number for yours.
Typical installed prices by project
What homeowners in and around Waukesha County typically pay, from a southeast Wisconsin installer’s published prices, national cost guides and Generac’s own figures. Where a service has its own page, the link has the details. For the Generac models and what a Generac install typically costs, see Generac generators.
| Project and typical priceProject | Typical price |
|---|---|
| Whole-home standby generator (18–26 kW)$8,000–$16,000Air-cooled, installed with the transfer switch, fuel connection, pad and permits. This is Generac’s own installed estimate for most homes. | $8,000–$16,000 |
| Essentials standby generator (10–14 kW)$6,000–$9,500A smaller unit on an essential-circuit switch: furnace, sump pump, fridge, well pump, lights and outlets. | $6,000–$9,500 |
| Large-home generator (30–48 kW)$15,000–$25,000For large homes with heavy loads, installed; a national cost-guide range across brands. Units over 30 kW are liquid-cooled. | $15,000–$25,000 |
| The generator alone (20–24 kW, any brand)$5,000–$6,500Equipment only, from national cost guides across brands; not our price and not a Generac list price. Installation (labor, wiring, gas pipe, pad and permits) typically adds $3,000–$5,000. We sell the Generac generator and install it, in one written price. | $5,000–$6,500 |
| Natural gas line to the generator$400–$1,500About $15–$30 per foot for a typical run, more for long or underground runs. Usually part of the install price; a meter or service-line upgrade, if needed, is quoted by We Energies. | $400–$1,500 |
| Propane tank, 500 gallons$1,000–$2,500Bought and set above ground; $1,500–$3,000 buried. Leasing is often free with a minimum-usage agreement, otherwise about $25–$175 a year. | $1,000–$2,500 |
| Automatic transfer switch$600–$2,500Installed on its own, for example for a generator you already have; with a new standby install it is part of the price. Load-management modules run about $130–$250 each before installation. | $600–$2,500 |
| Generator replacement$8,000–$16,000About the same as a new whole-home install, since the generator is a large share of the price. Reusing a sound pad, gas line and switch trims it. | $8,000–$16,000 |
| Electrical panel or service upgrade (100 to 200 amps)$1,300–$4,000Installed. On a generator job, only needed when the panel can’t take the transfer switch; the written quote says so. Any utility charge for a service change is the utility’s. | $1,300–$4,000 |
| Electrical work, small job$150–$600A typical small job such as an outlet, a light fixture or a repair. Electricians typically charge about $50–$120 an hour, often with a minimum or a first-hour service charge; bigger jobs are priced as a project. | $150–$600 |
| Yearly maintenance$200–$650 / yearA yearly service visit or maintenance plan: oil and filter, inspection and battery check. Basic visits can cost less. | $200–$650 / year |
| Permits$80–$450All permits together. Each city, village or town sets its own fees. | $80–$450 |
| Running on natural gas$2–$3.50 / hourA 22 kW unit at half to full load, at Wisconsin’s 2025 average residential gas price. | $2–$3.50 / hour |
| Running on propane$5–$8 / hourA 22 kW unit at half to full load, at last winter’s Wisconsin residential propane prices, before tax. | $5–$8 / hour |
Typical ranges as of October 2026. They are not quotes and not our price list: your free in-home estimate gives the real number for your home, in writing, before anything is ordered.
Five things set the number
- 1Generator sizeEssential-circuit units cost less than whole-home units, and liquid-cooled units for very large homes cost more.
- 2Fuel connectionA short gas run is simple; a meter upgrade, a long trench or a new propane tank adds cost.
- 3Distance to the panelThe farther the generator sits from the panel and meter, the more wire, pipe and labor.
- 4Transfer switch and panelWhole-home switches, load management or an older panel that needs upgrading all change the number.
- 5Permits and site workPermit fees, pad preparation and any grading or landscaping repair around the pad.
- Your Generac generator, sized by load calculation
- Pad, set to code clearances
- Automatic transfer switch
- Gas or propane connection
- Wiring between generator, switch and panel
- Installed by a licensed electrician
- Permits and inspections
- Startup, testing and walkthrough
One written price, before anything is ordered. No surprises on install day.
Ways to keep the cost down
Cover the essentials
An essential-circuit setup with a smaller generator costs less than whole-home coverage, and still keeps the heat, sump pump and fridge running.
Learn more →Use load management
Load management lets a smaller generator handle big loads one at a time, instead of paying for a unit sized to run everything at once.
Learn more →Place it close
The shorter the run to the gas meter and the panel, the less pipe, wire and labor. We look for the closest spot the clearances allow.
Learn more →Reuse what is sound
Replacing an old generator? A pad, gas line and transfer switch that are still sound and right for the new unit can often stay, which trims the installation side.
Learn more →Not sure how big a generator you need? The size calculator gives you a range in 30 seconds.
Generator cost questions
Timing, permits, sizing and fuel are on the FAQ page, and each service page answers the questions about that kind of install.

Get a written price for your home
Free in-home estimate, a written quote, and a generator sized to your home.